Routes
Coastal Site
For coastal installations, the route starts with salt air, road access, and the way the machine will enter the building. A CNC or laser cell going to Durban, Cape Town, Gqeberha, or Richards Bay needs different packing checks and site prep from an inland delivery.

Coastal machine planning points
Coastal Site covers machine planning for installations near the South African coast. It takes account of site conditions that can affect transport, placement, and the way equipment is prepared before commissioning.
Near the coast, corrosion risk changes the brief before the crate is even closed in China. We check container exposure, offloading method, door heights, slab condition, power supply, and the distance from port to site. Sea air, tight factory yards, and municipal delivery rules can all affect how a machine is moved, positioned, and protected before commissioning starts.
Send photos of the machine area, entry points, and any crane or forklift access before transport is booked. Include the base layout, nearest DB board, extraction position, and anything that has rusted, tripped, or shifted at the site before. That gives a clearer picture of what the machine will face once it lands.
What the coastal brief covers
The brief records machine model, dimensions, lifting requirements, utilities, and any protection needed for a marine environment. It also sets out where the crate will be opened, how the machine will be levelled, and which accessories must be present before power-on. For imported CNC and laser equipment, these details matter more than a generic site note.
Link the coastal installation note to the correct route record and shipping file before any extra scope is added. Ask for a dispatch inspection in China that checks the machine, chiller, extractor, tooling, and listed options against the order.
- Doorways measured against machine footprint
- Rust-prone areas photographed before placement
- Photos and site details by email
Coastal conditions that change installs
Sites near Durban harbour, Cape Town port, and smaller coastal industrial zones often have delivery constraints that do not show on a machine spec sheet. Older buildings can have uneven slabs, limited turning space, low roller doors, or power reticulation that needs checking before a heavy crate arrives. If extraction, air lines, or three-phase supply are already in place, include that in the brief.
Salt in the air can affect exposed metal, electrical cabinets, rails, fasteners, and stored consumables if protection is not considered early. Moisture also changes how long a machine should stand after unpacking before final checks and first test cuts. During commissioning, power quality and earthing should be verified with the site conditions in mind.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Information to send for coast sites
Brief Coastal Site with site photos, timing, machine details, and what has already failed. Keep the subject line clear.
Provide site photos, machine details, preferred delivery timing, and a short note on any failure that has happened there before. Useful examples include corrosion on stored stock, water ingress, unstable voltage, access problems, or lifting limits inside the building. Keep the machine reference and site location clear in the message so the record stays tied to the correct project.
What our Machine Sourcing customers say
Verified Google reviews